Search found 3 matches

by Charles L. Cotton
Sun May 30, 2010 11:54 am
Forum: Shooting Ranges
Topic: PSC road construction
Replies: 34
Views: 3497

Re: PSC road construction

driver8 wrote:Maybe so. Dues are not real cheap now. I can't really see what it was that they did to it. I thought even if they only oiled it it should have cut out the dust but it's as bad as ever. I'm not even sure they can even still oil a road, they must have done something else to it.
Are you a member? If not, why are you there so often?

Chas.
by Charles L. Cotton
Sat May 29, 2010 10:19 pm
Forum: Shooting Ranges
Topic: PSC road construction
Replies: 34
Views: 3497

Re: PSC road construction

driver8 wrote:I guess I need to give it a chance but so far the new road to PSC is not too impressive. Inside the range is even worse. That could be a first class range someday if you didn't have to off road to get to it. I realize that possibly the average gun guy doesn't care what his vehicle looks like.. I have been going to PSC for over 30 years with other members and it has always been the same mess.
This may be the most inaccurate statement I've seen in years. It's a dirt road, but hardly "off-roading." I drive a Corvette and I have no problem at all. As SSKimber asked, are you a PSC member?

Chas.
by Charles L. Cotton
Tue May 11, 2010 9:10 pm
Forum: Shooting Ranges
Topic: PSC road construction
Replies: 34
Views: 3497

Re: PSC road construction

glbedd53 wrote:Anybody know the story on road construction at PSC and how long it will be out?
We have added a new eNewsletter feature to the website that let's us communicate much better with our members. If you want to receive these notices, go to http://www.psc-range.com" onclick="window.open(this.href);return false; and sign up for the eNewsletters.

The road is being completely redone. It will be smoothed, crowned and they are putting in a mixture that includes Portland cement. This will set over time and the road is supposed to be very hard and last much longer. It also will greatly reduce or eliminate dust!

The electric gate actuator will also be operation very soon. Initially, people will use a keypad, but we are moving to smart cards that will not only open the gate, it will log people in so we can do away with the manual log sheets.

We are also adding additional pistol bays, but that's another story.

Chas.

Return to “PSC road construction”