6/25 Class
6/26 Mailed
6/28 Received
7/6 Background under review
7/8 Manufacturing pending
7/9 (Saturday?) Manufacturing
And we're still Manufacturing on 7/12. Arrrgh!
I'm sure the laminator caught fire Monday morning, and DPS is ordering esoteric parts from an individual craftsman in some third world country . . . and they'll have to be delivered by boat, but no one in Austin will know how to properly install the part, so it'll break and another will be ordered, but it'll be for a newer laminator that will require DPS to update the entire application process . . . so my packet will be voided, and I'll have to do it all over again.
Hope is lost. I'm going to sell my guns and buy a sword + several large flashlights. Probably an ostrich, while I'm at it. Put spurs and a spotlight on that sucker, have Crossbreed make us a saddle, maybe outfit my basset hound with some body armor.
I'm going to spend the rest of my life riding a "tactical ostrich", pointing at my sword, dragging an armored (and sleeping) basset hound behind me.
Thanks a lot, Bureaucracy.
